Clemons Creek Middle School

Anna, Texas

Fall 2023

Clemons Creek Middle School is designed to reflect the district’s culture while embracing a vision for innovation. The building’s main corridor serves as a central spine, connecting two wings with a clear line of sight from one entry to the other. The two-story classroom wing will accommodate 850 students in grades 6-8. While the design incorporates contextual brick materials, modern metal panels introduce a progressive element. The second wing includes a fine arts department, an open-concept cafetorium, a practice gym, a competition gym, and a storm-shelter-equipped locker room.

WRA Architects: Anna ISD Clemons Creek Middle School Interior Foyer & Stairwell
Project Name Clemons Creek Middle School
Size 150,000 SF
Budget $47,200,000
Completion Date Fall 2023
Location Anna, Texas
Owner Anna Independent School District
Contractor Lee Lewis Construction
WRA Architects: Anna ISD Clemons Creek Middle School Interior Gym Weight Room
WRA Architects: Anna ISD Clemons Creek Middle School Exterior Football Field & Track

At the heart of the school, the media center features a double-height space with floor-to-ceiling windows, offering transparency and visual connection to the nearby elementary school.

Previous
Previous

ANNA ISD: | Administration Building

Next
Next

CRANDALL ISD: | Opal Smith Elementary School