Rosamond-Sherley Elementary School
Anna, Texas
Fall 2022
This new elementary school unites Anna ISD’s commitment to equal resources with a forward-looking design. The two-story classroom wing serves up to 800 Pre-K through 5th-grade students, providing each classroom with natural light through exterior windows. High windows flood the media center—the academic core—with daylight, creating a central, multifunctional space that connects visually and physically across both levels. Dedicated spaces for art, music, special education, and science are strategically located for easy access, while secure exterior play areas are designed within the building perimeter and covered for weather protection.
Project Name | Rosamond-Sherley Elementary School |
Size | 85,000 SF |
Budget | $22,000,000 |
Completion Date | Fall 2022 |
Location | Anna, Texas |
Owner | Anna Independent School District |
Contractor | Lee Lewis Construction |
The main corridor connects all school functions and fills the interior with natural light.